ELT 113.0 Top of concrete ELC 108.0 Top of crane girder ELG 96.0 Ground level ELF 88.0 Floor level ELB 59.0 Bottom level ELS 66.0 Bottom level of small one LG1 12.0 Half length of Main unit LG2 8.0 Half length of Baby unit TC_1 78.0 (Main unit) Turbibe center level DG_1 13.5 (Main unit) Diameter of generator pit HG_1 3.8 (Main unit) Height of generator pit D1_1 4.4 (Main unit) Diameter of turbine OS_1 6.0 (Main unit) Offset from turbine center to penstock center PS_1 5.1 (Main unit) Diameter of penstock GH_1 3.7 (Main unit) Draft gate height GW_1 13.6 (Main unit) Draft gate width including pier 2m TC_2 78.0 (Baby unit) Turbine center level DG_2 8.2 (Baby unit) Diameter of generator pit HG_2 3.2 (Baby unit) Height of generator pit D1_2 2.2 (Baby unit) Diameter of turbine OS_2 3.2 (Baby unit) Offset from turbine center to penstock center PS_2 2.7 (Baby unit) Diameter of penstock GH_2 2.6 (Baby unit) Draft gate height GW_2 5.6 (Baby unit) Draft gate width (no pier)